017_Municipality of Fiorenzuola D'Arda torna alla ricerca

LOCATION: North of Fiorenzuola (44°55’22”80 N 09°54’36”00 E), at an average of 80 metres above sea level, plain area with an inclination by 1%; infrastructural assets A1 (motorway); first aquifer depth at 2-5 metres from soil level

ACCESSIBILITY AND SERVICES: connection to Fiorenzuola D’Arda tollgate of A1 MILANO-NAPOLI motorway (1-5 km); nearest logistic centre situated in Piacenza, Le Mose (>10 km)

INFRASTRUCTURAL SERVICES: A service road network plan will have to imply an extension of the existing one in order to allow access to the new sector

CURRENT PLANNING RULES AND REGULATIONS: Municipal structural plan (PSC) approved in December 2010

UTILITIES: electricity supply, connection to water purification plant

GOALS: The building of the area, limited in its territory by the motorway and TAV (High Speed Railway) networks and even more by the existing building code bands, can be only aimed at completing existing settlements, exploiting non-edified areas meant for parking and for operating heavy vehicles

INTERVENTIONS OF TRANSFORMATION: The public space inside the area is realised by the acquisition of the areas needed for the infrastructure of the settlements; the remaining portion, provided by law and by the compensative measures estimated by local administration, is made available for the achievement of urban quality objectives. The building will have to be within the boundaries of the lots, within the code bands of the infrastructures which are present in the area, of the motorway and of TAV network; non-edified areas will help to maintain the proper ecological balance levels required by ARPA (a regional agency acting for the protection of the environment)