Scout for available lots and dismissed areas > Montale 2back to searchback to map

Montale 2

AREA DETAILS

Area name

Montale 2

Contacts

Name Surname:

 

E-mail:

 

Phone:

 

GEOGRAPHY

Localization (Municipality)

Piacenza

CURRENT STATUS

Infrastructures and services (highway exits, railway stations, terminals, logistic hubs)

Ring road leading to the Piacenza South exit. Presence of numerous logistic centers located along the communication artery in the eastern part of the city.

Criticità (vincoli, fasce di rispetto, tutele storico-ambientali)

Setback area of the railway; ENEL 132 Kw power line tower; to-be-drained canal

FUTURE DESTINATIONS

Current planning phase (Implementation Plans, Urbanistic Plans, agreements…)

Detailed Plan approved with DCC 178/2005: AP 14 Jobs - sub-compartment B

Agevolazioni

Note

Within the detailed plan, sub-compartments C (Area = 4,760 sqm) and D (Area = 4,975 sqm) are also identified, with a total assigned area of 3,890 sqm.

TECHNICAL FEATURES

In force urbanistic instrument (Psc, Prg….)

PSC-RUE: PUA prevalentemente produttivi - residui PRG confermati dal PSC

Total territorial surface (St)

31.553 mq

Functions to be settled

Productive and tertiary uses

Building index (lt mq/mq)

Ut = 0,4

Gross useful area (Slu=St*It)

Assigned area to the sub-compartment = 11,380.14 sqm

Standards requested (green, parking, roads…)

  • Assigned to sub-compartment B: P= 1,648.91 sqm; V= 4,897.52 sqm;
  • At the start of the implementation procedures, the implementing entity undertakes to participate in the realization of the remaining urbanization works for its share of responsibility (in particular, roads outside the compartment) and to reimburse the Municipality for the expropriation indemnities for its share of responsibility.