Scout for available lots and dismissed areas > Montale 2back to searchback to map
Montale 2
AREA DETAILS
Area name
Montale 2
Contacts
Name Surname:
E-mail:
Phone:
GEOGRAPHY
Localization (Municipality)
Piacenza
CURRENT STATUS
Infrastructures and services (highway exits, railway stations, terminals, logistic hubs)
Ring road leading to the Piacenza South exit. Presence of numerous logistic centers located along the communication artery in the eastern part of the city.
Criticità (vincoli, fasce di rispetto, tutele storico-ambientali)
Setback area of the railway; ENEL 132 Kw power line tower; to-be-drained canal
FUTURE DESTINATIONS
Current planning phase (Implementation Plans, Urbanistic Plans, agreements…)
Detailed Plan approved with DCC 178/2005: AP 14 Jobs - sub-compartment B
Agevolazioni
Note
Within the detailed plan, sub-compartments C (Area = 4,760 sqm) and D (Area = 4,975 sqm) are also identified, with a total assigned area of 3,890 sqm.
TECHNICAL FEATURES
In force urbanistic instrument (Psc, Prg….)
PSC-RUE: PUA prevalentemente produttivi - residui PRG confermati dal PSC
Total territorial surface (St)
31.553 mq
Functions to be settled
Productive and tertiary uses
Building index (lt mq/mq)
Ut = 0,4
Gross useful area (Slu=St*It)
Assigned area to the sub-compartment = 11,380.14 sqm
Standards requested (green, parking, roads…)
- Assigned to sub-compartment B: P= 1,648.91 sqm; V= 4,897.52 sqm;
- At the start of the implementation procedures, the implementing entity undertakes to participate in the realization of the remaining urbanization works for its share of responsibility (in particular, roads outside the compartment) and to reimburse the Municipality for the expropriation indemnities for its share of responsibility.